Explore how real options and strategic decision points can enhance project valuation, featuring a practical binomial model and key exam insights.
Let’s take a quick step back and imagine you’re a finance manager at a mid-sized manufacturing firm. You’re appraising a large expansion project that, on the surface, looks pretty good in a standard net present value (NPV) framework. You do the usual: forecast cash flows, estimate a discount rate, maybe toss in a salvage value if you plan to sell the equipment after the project is done. But—here’s the twist—this project actually has a built-in strategic flexibility. If demand skyrockets for your specialized product, your firm can expand capacity further at some point. And if the market tanks and margins collapse, you might abandon the project altogether. Those are real options.
Real options are all about decision-making at various points in time. They’re called “options” for a reason: you don’t have to expand (or abandon), but if it becomes advantageous, you can. And that might significantly boost the overall value of your project.
In a typical CFA Level II reading, you might see a more formula-driven approach, but let’s walk through a scenario-based method (often called a binomial tree) so we can see how all these bits and pieces come together.
• Forecast Horizon: Let’s say we have a five-year project. But we’ll simplify the binomial approach to just two decision points—one at the end of Year 1 and the other at the end of Year 3.
• Discount Rate/Cost of Capital: Suppose the project’s required rate of return is 10%. This might be your WACC (weighted average cost of capital) if it’s a typical project for your firm.
• Volatility and Probability: The real art here is forecasting the volatility of expected cash flows or the volatility of underlying demand. Typically, you’d estimate this from historical data or scenario analysis. You could also rely on your best guess of how wide the range of outcomes might be.
• Salvage Value: This is crucial if you have an abandonment option. Think of salvage as the disposal value if you decide to terminate early. Under IFRS or US GAAP, salvage (or residual) values are determined based on fair value less costs to sell.
Let’s define two real options that we’ll weave into our example:
In standard financial modeling, we often treat projects as if everything is set in stone from Day 0. But strategic decisions don’t always happen in a vacuum. Managers can adapt, pivot, or exit based on evolving market conditions. That flexibility has value—just like a stock option does—except here it’s an option on a real (tangible or intangible) asset.
In short:
• If conditions are favorable, we press on (or expand).
• If conditions are terrible, we cut our losses (or abandon).
• If conditions are moderate, we proceed as planned, with baseline assumptions.
Let’s illustrate how you might evaluate this expansion project using a binomial tree. For clarity, we’ll keep the numbers relatively simple, but the idea is the same for more complex or layered real options.
Imagine the project’s initial outlay is $1,000,000 (Year 0). Without any real options, you forecast net cash flows such that the present value of those future cash flows is $1,100,000. So, the base-case NPV is:
That’s a positive NPV, so you might be thinking, “Yay, let’s go for it!”
But let’s see how the real options magnify (or reduce) that figure.
We have two decision points—after Year 1 and after Year 3. Let’s create a schematic to visualize the up (U) and down (D) states. We’ll assume a simplified approach:
• Probability of “up” (U) each period: p
• Probability of “down” (D) each period: 1 - p
• In an “up” scenario, your project’s value might rise by 25%.
• In a “down” scenario, your project’s value might drop by 20%.
Here’s the basic structure:
graph LR A["Year 0 <br/> Project Start"] --> B["End of Year 1 <br/> Up State (U1)"] A["Year 0 <br/> Project Start"] --> C["End of Year 1 <br/> Down State (D1)"] B["End of Year 1 <br/> Up State (U1)"] --> D["End of Year 3 <br/> Up-Up (U2)"] B["End of Year 1 <br/> Up State (U1)"] --> E["End of Year 3 <br/> Up-Down (UD)"] C["End of Year 1 <br/> Down State (D1)"] --> F["End of Year 3 <br/> Down-Up (DU)"] C["End of Year 1 <br/> Down State (D1)"] --> G["End of Year 3 <br/> Down-Down (D2)"]
• Year 0: You invest $1,000,000 right away.
• End of Year 1: You see how demand shakes out. If it’s strong (U1), you can choose to expand. If it’s weak (D1), you proceed but keep your eyes on that abandonment possibility later.
• End of Year 3: If still going strong, you might keep operating until the final year (Year 5), or if things are lackluster, you might salvage.
Let’s say that, if you choose to expand after Year 1 in the up state, you spend an extra $300,000. The net effect of that expansion (based on your demand forecast) might add $400,000 in present value terms over the remainder of the project. So effectively, the expand option has an NPV of +$100,000 right at the end of Year 1.
If you’re in a down-state after Year 1, you make no further investments but soldier on, hoping the market recovers. By the end of Year 3, you see whether conditions bounce back up (DU) or keep trending downward (D2). If it’s D2, maybe you decide to abandon with a salvage value of, say, $150,000.
A simplified table might look like this at the end of Year 3 (not discounted back yet):
Node | Project Value Without Option | Expansion or Abandonment Decision | Resulting Value |
---|---|---|---|
U2 | $1,500,000 | No new option exercise (already expanded at Year 1) | $1,500,000 |
UD | $1,100,000 | Already expanded, moderate demand | $1,100,000 |
DU | $900,000 | No expansion, but continue | $900,000 |
D2 | $600,000 | Abandon to salvage: $150,000 | $150,000 |
The differences in these final values reflect the cumulative effect of either expansion or no expansion and how the market evolves. Notice that in the D2 scenario—when conditions go from down to even worse—you’d be better off just selling your assets (abandoning) for $150,000.
Now, you’d discount these end-of-Year-3 values back to the end of Year 1, factoring in probabilities. Then from the end of Year 1, you discount back to Year 0. But remember: at Year 1, you also have an immediate investment outlay of $300,000 if you choose to expand. Let’s do a rough calculation for the up branch:
• Probability of going U1 → U2: \( p \times p = p^2 \).
• Probability of going U1 → UD: \( p \times (1-p) = p(1-p) \).
For the down branch:
• Probability of going D1 → DU: \( (1-p)p \).
• Probability of going D1 → D2: \( (1-p)(1-p) \).
You’d then incorporate the expansion option’s cost at Year 1 for the U1 branch. If the up scenario hits, you expand, which hopefully leads to the chance of even higher payoff later. If we assume discounting at 10% over a two-year period from Year 3 to Year 1 for the final payoff, and then from Year 1 to Year 0 for one more year, it might look like:
Then you discount that quantity by another year at 10% to get the present value at Year 0. In the down branch, you do a similar approach, but there’s no expansion cost. Instead, you incorporate salvage if it’s extremely bad at the end of Year 3.
Yes, it can get a bit messy. But that’s the gist: you compute partial NPVs at each decision node, incorporate the (up or down) probabilities, discount them, and compare that to the alternative (not expanding, or not abandoning).
When you add in the real options, you usually get a project value that’s higher than the base NPV. For instance, your base NPV might have been $100,000. But analyzing the possible expansions might add another $30,000 in expected value, while the abandonment option might salvage you from some nasty downside, adding another $20,000 in expected value. Altogether, that puts the “strategic NPV” at $150,000. The example is simplified, but you see how it works.
From an exam standpoint, you might be asked to:
• Compute the project’s base-case NPV.
• Determine the “with expansion” scenario’s expected value at Year 1.
• Factor in the salvage or abandonment conditions and see how that changes your final discounted payoff.
• Offer a short explanation (in a short-answer or multiple-choice format) of why real options are relevant.
Seriously, do not forget that final part; CFA exam items love testing conceptual understanding too.
• Overestimating Volatility: If you assume extremely large up or down movements, you might inflate the value of the real option. Be real in your assumptions.
• Ignoring Managerial Constraints: Sometimes, even if the numbers say “Expand,” managers might not have the capital or the appetite for additional risk. On the exam, read the vignette carefully to see if the text hints that management is reluctant to invest further.
• Mixing Timelines: You must be consistent with your discounting periods. If you have a three-year gap to the next decision node, discount it at (1 + r)^3, not (1 + r)^2. A small detail, but I’ve seen people slip on that in practice.
• Missing the Value of Abandonment: People sometimes skip the salvage path altogether. But if a project is performing terribly in the future, that salvage might literally cap your losses.
• Know your binomial approach: The simplest exam question might give you direct up/down potential NPVs, along with probabilities. Then they ask for the real option value.
• Watch the wording: If the question says “If net profit margin falls below 10%, management will abandon,” note how that triggers a salvage.
• Time constraints: In the real world, you might build a more robust model in Excel. On the exam, you’ve got minutes to do quick calculations, so practice your setups.
• Combine conceptual and quantitative: The item set might have one question about the math (NPV with real options) and another about the conceptual logic (“Why does the real option to abandon increase the project’s value?”).
• Official CFA Program Sample Item Sets on Equity Valuation – Real Options Section.
• Trigeorgis, L. “Strategic Capital Budgeting: Valuing Real Options.” Financial Management.
• The Journal of Applied Corporate Finance.
Many of these articles dive deeper into advanced modeling. But if you want a more accessible take, you can also look online for real options case studies—some top universities post them for free.
Important Notice: FinancialAnalystGuide.com provides supplemental CFA study materials, including mock exams, sample exam questions, and other practice resources to aid your exam preparation. These resources are not affiliated with or endorsed by the CFA Institute. CFA® and Chartered Financial Analyst® are registered trademarks owned exclusively by CFA Institute. Our content is independent, and we do not guarantee exam success. CFA Institute does not endorse, promote, or warrant the accuracy or quality of our products.